Mobile/Tablet Version   |   PC Version
Use the Approval and Routing tab to obtain approvals and develop routing procedures for the 209.

Tab 6: Approval and Routing

Note:NOTE:
  • All required blocks on this tab must be completed before the 209 can be approved and finalized. Incomplete information results in an error message similar to the one shown below.

Tab 6: Missing Required Fields