GACC Summary Situation Report   10/29/2009
by Protection

Southwest

Wildfire Information Section (All fires, even if reported on a 209)

Agency
State
Unit
Fire
Dngr
P
L
Human Lightning Uncontrolled Fires Rx WFU
Fires Acres Fires Acres A-B-C D+ Fires Acres Fires Acres
BIA AZ-CRA H 1 1 0 0 0   0 0 0 0 0
BIA AZ-FYA H 1 1 0 0 0   0 0 0 0 0
BIA AZ-PMA L 1 1 0 0 0   0 0 0 0 0
BIA AZ-PPA M 2           1        
BIA AZ-SCA M 3 1 0 0 0   0 3 165 0 0
BIA Total:   4 0 0 0 0 1 3 165 0 0

Agency
State
Unit
Fire
Dngr
P
L
Human Lightning Uncontrolled Fires Rx WFU
Fires Acres Fires Acres A-B-C D+ Fires Acres Fires Acres
BLM AZ-SAD M 2 6 1 0 0   0 0 0 0 0
BLM Total:   6 1 0 0 0 0 0 0 0 0

Agency
State
Unit
Fire
Dngr
P
L
Human Lightning Uncontrolled Fires Rx WFU
Fires Acres Fires Acres A-B-C D+ Fires Acres Fires Acres
NPS AZ-GCP M 2 0 0 0 0   1 1 325 0 0
NPS Total:   0 0 0 0 0 1 1 325 0 0

Agency
State
Unit
Fire
Dngr
P
L
Human Lightning Uncontrolled Fires Rx WFU
Fires Acres Fires Acres A-B-C D+ Fires Acres Fires Acres
ST AZ-AZS H 2 1 0 0 0   0 0 0 0 0
ST Total:   1 0 0 0 0 0 0 0 0 0

Agency
State
Unit
Fire
Dngr
P
L
Human Lightning Uncontrolled Fires Rx WFU
Fires Acres Fires Acres A-B-C D+ Fires Acres Fires Acres
USFS AZ-CNF M 2 1 10 0 0   0 0 0 0 0
USFS AZ-COF M 2 9 14 0 0   0 3 420 0 0
USFS AZ-KNF M 3 2 0 0 0   4 1 200 0 0
USFS AZ-TNF M 3 1 1 0 0   0 7 375 0 0
USFS Total: 13 25 0 0 0 4 11 995 0 0
Grand Total: 24 26 0 0 0 6 15 1,485 0 0


Units in Low = 39, Moderate = 22, High = 14, Very High = 0, Extreme = 0,


Year-to-Date Wildland Fire Activity Rx & WFU Fire Activity

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
BIA AZ-CRA 33 897 0 0 33 897 0 0 0 0
BIA AZ-FTA 14 19 84 2,732 98 2,751 0 0 0 0
BIA AZ-FYA 28 142 0 0 28 142 0 0 0 0
BIA AZ-HOA 22 5 1 0 23 5 0 0 0 0
BIA AZ-NAA 80 991 53 164 133 1,155 4 4,050 0 0
BIA AZ-PMA 99 67 0 0 99 67 0 0 0 0
BIA AZ-PPA 84 46,541 0 0 84 46,541 0 0 0 0
BIA AZ-SCA 169 125 71 22,736 240 22,861 21 1,344 0 0
BIA AZ-TCA 24 3 11 387 35 390 0 0 0 0
BIA NM-JIA 0 0 36 69 36 69 2 142 0 0
BIA NM-MEA 20 284 4 5,311 24 5,595 1 7,499 0 0
BIA NM-NPA 1 1 1 0 2 1 4 460 0 0
BIA NM-RNA 0 0 2 0 2 0 0 0 0 0
BIA NM-SPA 14 11 5 141 19 152 3 90 0 0
BIA NM-ZUA 5 18 2 1,032 7 1,050 0 0 0 0
BIA Total: 593 49,104 270 32,572 863 81,676 35 13,585 0 0

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
BLM AZ-CRD 70 586 9 157 79 743 8 4,552 0 0
BLM AZ-PHD 35 356 2 5 37 361 4 2,898 0 0
BLM AZ-SAD 12 126 3 161 15 287 0 0 0 0
BLM NM-ABD 0 0 0 0 0 0 0 600 0 0
BLM NM-CAD 16 279 11 21,026 27 21,305 2 7,669 0 0
BLM NM-FAD 6 3 58 25 64 28 0 0 0 0
BLM NM-LCD 13 12,248 3 237 16 12,485 5 5,500 0 0
BLM NM-ROD 12 8,242 12 40,691 24 48,933 4 6,208 0 0
BLM NM-SCD 2 2,971 4 1,552 6 4,523 3 21,950 0 0
BLM NM-TAD 0 0 0 0 0 0 1 60 0 0
BLM Total: 166 24,811 102 63,854 268 88,665 27 49,437 0 0

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
FWS AZ-BAR 1 2,706 0 0 1 2,706 0 0 0 0
FWS AZ-CBR 1 102 0 0 1 102 1 250 0 0
FWS AZ-CPR 1 30 0 0 1 30 0 0 0 0
FWS AZ-HVR 1 0 0 0 1 0 0 0 0 0
FWS AZ-IMR 1 3 0 0 1 3 0 0 0 0
FWS NM-BTR 2 1 0 0 2 1 1 244 0 0
FWS NM-LVR 1 0 1 1 2 1 0 0 0 0
FWS NM-MXR 0 0 0 0 0 0 1 7 0 0
FWS NM-SER 0 0 1 1,000 1 1,000 0 0 0 5,000
FWS Total: 8 2,842 2 1,001 10 3,843 3 501 0 5,000

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
NPS AZ-CHP 0 0 2 7 2 7 0 0 0 0
NPS AZ-COP 0 0 0 0 0 0 1 56 0 0
NPS AZ-GCP 3 0 19 4,747 22 4,747 2 330 0 0
NPS AZ-ORP 3 1 0 0 3 1 0 0 0 0
NPS AZ-SAP 1 0 1 62 2 62 0 0 0 0
NPS AZ-SUP 0 0 2 1 2 1 0 0 0 0
NPS AZ-TUP 1 23 0 0 1 23 1 50 0 0
NPS NM-BAP 0 0 3 1,444 3 1,444 0 0 0 0
NPS NM-CCP 1 6 1 3 2 9 1 179 0 0
NPS NM-EMP 0 0 0 0 0 0 1 245 0 0
NPS NM-PEP 0 0 0 210 0 210 0 0 0 0
NPS TX-BBP 0 0 0 0 0 0 0 0 1 81
NPS TX-GUP 7 192 0 0 7 192 0 0 0 0
NPS TX-LAP 19 1,314 0 0 19 1,314 0 0 0 0
NPS Total: 35 1,536 28 6,474 63 8,010 6 860 1 81

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
OTHR NM-LAE 0 0 1 1 1 1 0 0 0 0
OTHR Total: 0 0 1 1 1 1 0 0 0 0

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
ST AZ-AZS 237 27,114 40 2,831 277 29,945 0 0 0 0
ST NM-N1S 10 39 20 9 30 48 0 0 0 0
ST NM-N2S 7 187 29 586 36 773 0 0 0 0
ST NM-N3S 43 2,157 18 97,012 61 99,169 0 0 0 0
ST NM-N4S 41 7,127 35 7,119 76 14,246 0 0 0 0
ST NM-N5S 187 54,182 102 88,487 289 142,669 0 0 0 0
ST NM-N6S 127 1,005 8 149 135 1,154 0 0 0 0
ST Total: 652 91,811 252 196,193 904 288,004 0 0 0 0

Agency
State
Unit
Human Lightning Total Rx WFU
Fires Acres Fires Acres Fires Acres Fires Acres Fires Acres
USFS AZ-ASF 67 979 111 14,320 178 15,299 9 18,926 0 0
USFS AZ-CNF 48 33,095 60 21,060 108 54,155 13 25,650 0 0
USFS AZ-COF 141 273 151 25,549 292 25,822 70 11,776 0 0
USFS AZ-KNF 30 20 96 34,298 126 34,318 363 12,671 0 0
USFS AZ-PNF 20 11 33 1,062 53 1,073 31 6,933 0 0
USFS AZ-TNF 88 1,493 110 5,496 198 6,989 105 10,766 0 0
USFS NM-CAF 29 105 47 28 76 133 5 4,257 0 0
USFS NM-CIF 29 2,807 25 389 54 3,196 10 16,752 0 0
USFS NM-GNF 33 972 161 1,458 194 2,430 8 12,080 7 55,795
USFS NM-LNF 7 70 21 204 28 274 15 8,353 0 0
USFS NM-SNF 15 2 49 659 64 661 6 6,746 0 0
USFS NM-VCF 0 0 7 59 7 59 0 0 0 0
USFS Total: 507 39,827 871 104,582 1,378 144,409 635 134,910 7 55,795
Grand Total: 1,961 209,931 1,526 404,677 3,487 614,608 706 199,293 8 60,876


Remarks by reporting office
NM-ABC Albuquerque Interagency Dispatch Center No Fire Activity or Rx to report.
AZ-ADC THIS REPORT COVERS THE PERIOD 10/22/09 - 10/29/09.
NM-ADC
AZ-PDC
AZ-PHC This report covers the period fr 10/22/09 to 10/29/09.
AZ-TDC THIS SIT REPORT IS FOR 10/23 THRU 10/29, EXCLUDING THE THREE PEAKS FIRE. THREE PEAKS FIRE ACRES WHERE ENTERED 10/28.


Large Incidents:
THREE PEAKS AZ-PPA-000076 Type: WF Start: 10/26/2009 0745 Cause: U Priority:
Overhead Team Name: JIM ETSHOKIN Type: Type 3 IC Local: GACC:
Size:
5,737 ACRES
% Cnt/MMA:
70 %
Est Contain:
11/02/2009
Latitude:
31° 39´ 48"
Longitude:
111° 37´ 31"
Location: 10 NW OF SASABE $$ Costs to Date: $141,500
Structures Threatened: 1 PRIM , 2 OUTB Structures Destroyed: NONE
Resources Committed: Total Personnel: 129 Report Date: Oct 28, 2009 1625
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BIA 0 0 0 0 0 0 2
BLM 0 0 0 0 0 0 0
FWS 0 0 0 0 0 0 0
ST 5 0 0 0 0 1 5
USFS 0 0 0 0 1 2 2
Significant Events: COLD FRONT PASSING THROUGH AIDED IN SUPPRESSION TACTICS.

Remarks: ACREAGE BREAKDOWN: BIA-2721, STATE-2315.7, BLM-498, PRIVATE-201.5 TOTALLING 5737.2

Observed Fire Behavior: MINIMAL WITH SOME BACKING FIRE (TWO FOOT FLAME LENGTHS)

Planned Actions: DIRECT ATTACK.



Bachelor AZ-ASF-090370 Type: WF Start: 10/17/2009 1000 Cause: H Priority:
Overhead Team Name: D. Reisner Type: Type 3 Team Local: GACC:
Size:
750 ACRES
% Cnt/MMA:
80 %
Est Contain:
10/26/2009
Latitude:
34° 16´ 38"
Longitude:
110° 52´ 2"
Location: 1 mile NE of Ponderosa Estates. $$ Costs to Date: $225,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 108 Report Date: Oct 23, 2009 1500
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BLM 0 1 0 0 0 0 0
ST 0 2 0 0 0 0 1
USFS 2 0 0 0 1 6 10
Significant Events: HOLD AND MOP UP.

Remarks:

Observed Fire Behavior: INTERIOR GREEN POCKETS BURNING.

Planned Actions: HOLD AND MOP UP.



Chevlon Complex AZ-ASF-090261 Type: WF Start: 07/27/2009 1220 Cause: L Priority:
Overhead Team Name: Frank Auza Type: Type 4 IC Local: GACC:
Size:
11,710 ACRES
% Cnt/MMA:
NR %
Est Contain:
09/15/2009
Latitude:
34° 27´ 0"
Longitude:
110° 48´ 0"
Location: 9 to 13 miles North and Northwest of Forest Lakes Arizona $$ Costs to Date: $2,600,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 23 Report Date: Aug 28, 2009 1030
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
USFS 1 0 0 0 0 1 0
Significant Events: None.

Remarks: Crossing: Contained/Controlled, 2810 Acres. Weimer: Resource benefit, 2100 Acres. Durfee: Resource benefit, 6800 Acres.

Observed Fire Behavior: Crossing: No Activity. Weimer and Durfee: Low fire behavior.

Planned Actions: Crossing: Hold. Weimer and Durfee: Monitor.



Reno AZ-ASF-090319 Type: WF Start: 09/07/2009 1200 Cause: L Priority:
Overhead Team Name: Chris Johnson Type: Type 4 IC Local: GACC:
Size:
726 ACRES
% Cnt/MMA:
NR MMA
Est Contain:
NR
Latitude:
33° 36´ 19"
Longitude:
109° 26´ 38"
Location: 23 miles southwest of Alpine, AZ $$ Costs to Date: NR
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 2 Report Date: Oct 27, 2009 0846
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
USFS 0 0 0 0 0 0 2
Significant Events:

Remarks:

Observed Fire Behavior: Creeping and smoldering, north flank of the north spot backing north aspect.

Planned Actions: monitor



West Bull Flats AZ-FTA-0119 Type: WF Start: 08/15/2009 1305 Cause: L Priority:
Overhead Team Name: John Cervantes Type: Type 4 IC Local: GACC:
Size:
353 ACRES
% Cnt/MMA:
NR %
Est Contain:
NR
Latitude:
34° 15´ 30"
Longitude:
110° 42´ 34"
Location: 13 miles SW Heber, AZ $$ Costs to Date: NR
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 1 Report Date: Aug 21, 2009 1855
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BIA 0 0 0 0 0 0 1
 


Mud Springs AZ-FTA-000090 Type: WF Start: 07/26/2009 1536 Cause: L Priority:
Overhead Team Name: Harrison Francis Type: Type 4 IC Local: GACC:
Size:
1,100 ACRES
% Cnt/MMA:
NR MMA
Est Contain:
NR
Latitude:
33° 35´ 56"
Longitude:
109° 59´ 42"
Location: 17 miles south of Whiteriver AZ $$ Costs to Date: $24,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 8 Report Date: Aug 05, 2009 1800
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BIA 0 0 0 0 0 2 0
Significant Events:

Remarks:

Observed Fire Behavior: 1-2 ft flame lengths

Planned Actions: Continue to monitor



ASPEN AZ-GCP-000059 Type: WF Start: 08/11/2009 0000 Cause: L Priority:
Overhead Team Name: Carl Schwope Type: Type 3 IC Local: GACC:
Size:
4,179 ACRES
% Cnt/MMA:
NR %
Est Contain:
NR
Latitude:
36° 13´ 6"
Longitude:
111° 59´ 11"
Location: 4 MI. E OF NORTH RIM $$ Costs to Date: $1,162,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 22 Report Date: Aug 21, 2009 1840
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BLM 0 0 0 0 0 0 0
FWS 0 0 0 0 0 0 1
NPS 0 1 0 0 0 2 2
ST 0 0 0 0 0 0 1
USFS 0 0 0 0 0 0 3
 


Wild Horse Complex AZ-KNF-703 Type: WF Start: 08/02/2009 0001 Cause: L Priority:
Overhead Team Name: Robert Ortlund Type: Type 3 Team Local: GACC:
Size:
13,265 ACRES
% Cnt/MMA:
NR %
Est Contain:
NR
Latitude:
35° 28´ 2"
Longitude:
111° 54´ 59"
Location: 16 miles northeast of Williams $$ Costs to Date: $1,150,973
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 31 Report Date: Aug 11, 2009 1828
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BIA 0 0 0 0 0 1 0
PRI 0 0 0 0 0 0 0
ST 0 0 0 0 0 3 2
USFS 0 1 0 0 0 1 9
Significant Events:

Remarks: The Wild Horse Complex is being managed for resource benefit. The Planning Area encompasses 24, 396 acres. Transition to the local district and ICT4 will occur at 0700 Wednesday.

Observed Fire Behavior: Moderate fire behavior, short runs in the Pine type.

Planned Actions: Continue to burnout Division E. Patrol and secure fire edge.



Fracas AZ-KNF-00872 Type: WF Start: 09/03/2009 1500 Cause: L Priority:
Overhead Team Name: Brooks Baker Type: Type 3 Team Local: GACC:
Size:
2,339 ACRES
% Cnt/MMA:
90 %
Est Contain:
09/21/2009
Latitude:
36° 38´ 26"
Longitude:
112° 14´ 46"
Location: 5 miles S of JL $$ Costs to Date: $569,064
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 31 Report Date: Sep 20, 2009 1900
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BLM 0 0 0 0 0 0 1
NPS 0 1 0 0 0 0 0
USFS 0 0 0 0 0 5 7
Significant Events: Burnout Interior Fuels

Remarks:

Observed Fire Behavior:

Planned Actions: Hold & Patrol



Twin Fire AZ-KNF-1050 Type: WF Start: 10/02/2009 1300 Cause: H Priority:
Overhead Team Name: Bill Van Bruggen Type: Type 1 Team Local: GACC:
Size:
908 ACRES
% Cnt/MMA:
95 %
Est Contain:
10/11/2009
Latitude:
35° 12´ 33"
Longitude:
112° 14´ 10"
Location: 3 miles southwest of Williams, Ariz $$ Costs to Date: $3,075,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 10 Report Date: Oct 09, 2009 1405
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BLM 0 0 0 0 0 0 0
FWS 0 0 0 0 0 0 1
NPS 0 0 0 0 0 1 0
ST 0 0 0 0 0 0 0
USFS 0 0 0 0 0 1 2
WXW 0 0 0 0 0 0 0
Significant Events: 0

Remarks:

Observed Fire Behavior: o

Planned Actions: Patrol and mop up. Transition fire back to district at 12:00.



TURKEY NM-GNF-000304 Type: WF Start: 07/06/2009 1458 Cause: L Priority:
Overhead Team Name: James Type: Type 4 IC Local: GACC:
Size:
605 ACRES
% Cnt/MMA:
NR MMA
Est Contain:
NR
Latitude:
33° 19´ 58"
Longitude:
107° 54´ 21"
Location: 16 miles west of Winston, NM $$ Costs to Date: NR
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 2 Report Date: Aug 11, 2009 1200
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
USFS 0 0 0 0 0 0 2
Significant Events: None

Remarks: Fire is being managed for resource benefit. The Turkey Fire is being closely monitored by a fire lookout tower. Any significant activity will be reported and appropriate action will take place.

Observed Fire Behavior: Backing fire 1-3 inch flame lengths

Planned Actions: Continue to monitor fire and smoke.



Whitewater NM-GNF-00393 Type: WF Start: 07/25/2009 1723 Cause: L Priority:
Overhead Team Name: Scola, Flores (t) Type: Type 4 IC Local: GACC:
Size:
295 ACRES
% Cnt/MMA:
NR MMA
Est Contain:
12/25/2009
Latitude:
33° 19´ 41"
Longitude:
108° 46´ 7"
Location: 6 miles east of Glenwood, NM $$ Costs to Date: $7,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel:   Report Date: Oct 22, 2009 1100
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
Significant Events: None

Remarks: Fire is being managed for resource benefit.

Observed Fire Behavior: None

Planned Actions: None



PIPELINE AZ-KNF-000592 Type: WF Start: 07/22/2009 0816 Cause: L Priority:
Overhead Team Name: Eric White Type: Type 4 IC Local: GACC:
Size:
1,270 ACRES
% Cnt/MMA:
NR MMA
Est Contain:
08/20/2009
Latitude:
36° 35´ 42"
Longitude:
112° 21´ 53"
Location: 20 miles South of Fredonia AZ $$ Costs to Date: $57,000
Structures Threatened: NONE Structures Destroyed: NONE
Resources Committed: Total Personnel: 33 Report Date: Aug 20, 2009 0005
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS OVHD
BLM 0 0 0 0 0 0 0
FWS 0 0 0 0 0 0 0
NPS 0 0 0 0 0 0 0
ST 0 0 0 0 0 0 0
USFS 0 1 0 0 0 6 3
Significant Events:

Remarks:

Observed Fire Behavior: Mostly backing and flanking with some group torching.

Planned Actions: Finish black lining the perimeter.





Total Committed Resources to Large Fire.
Committed Resources
Resource APHI BIA BLM CNTY DDQ DHS FWS IA INTL LGR NPS OES ORC OTHR PRI ST USFS WXW Total
CRW1                               5 3   8
CRW2     1               2         2 2   7
HEL1                                     0
HEL2                                     0
HEL3                                 2   2
ENGS   3                 3         4 22   32
OVHD   3 1       2       2         9 40   57


Initial/Extended Attack Resources
Committed Resources Total
Committed
Available
Resources
Resource APHI BIA BLM CNTY DDQ DHS FWS IA INTL LGR NPS OES ORC OTHR PRI ST USFS WXW
CRW2   0                                 0 4


Total Committed Resources (Large Fire and IA/Extended Attack)
Committed Resources
Resource APHI BIA BLM CNTY DDQ DHS FWS IA INTL LGR NPS OES ORC OTHR PRI ST USFS WXW Total
CRW1                               5 3   8
CRW2     1               2         2 2   7
HEL1                                     0
HEL2                                     0
HEL3                                 2   2
ENGS   3                 3         4 22   32
OVHD   3 1       2       2         9 40   57


Return to the Report List Menu

Report executed on:   30-Oct-2009 1151 mountain time